Willamette Iron and Steel Works
Photo Credit:
Left: Al Farrow collection (1957)
Right: John Labbe collection (1940's)
Construction Number 13 - Built for: Crown Willamette Paper Co.
Data is "AS Built" by Willamette Iron and Steel Works
Class:
Tons-Trucks
70-3
Std. (56½")
Cylinders:
#-Dia. - Stk.
3 - 12" x 15"
Boiler:
[Style - Dia.]

EWT - 50.5"
Saturated
Boiler Pressure:
In Lbs. (PSI)
200 lbs
Driver Dia.:
36"
Gear Ratio:
2.37
Tractive Effort:
31,968 lbs.
Factor of
Adhesion:

5.51
Maximum
Safe Speed:

18.1
Empty Weight:
148,340 lbs.
Working Weight:
176,171 lbs.
Full Weight:
193,341 lbs.
Fuel / Capacity:
Oil / 1,200 Gals
Water Capacity:
3,000 Gals
Cab:
Steel,
All Weather
Shipped:
1-26-1924
Owners:
(1-26-1924) Crown Willamette Paper Co. #6, Astoria, OR
(1924) Crown Willamette Paper Co. #6, Cathlamet, WA
(1928) Crown Willamette Paper Co. #6, Youngs River, OR
(1928) Crown Zellerbach Corp. #6, Youngs River, OR
(1940) Crown Zellerbach Corp. #6, Cathlamet, WA
Disposition: (1958) Displayed as #6 at Cathlamet, WA
Additional Notes: